Manufacturing · Building materials

Panel specs from CAD drawings in seconds, not hours

Reads DWG/DXF layouts and builds the Excel spec: 10–30 seconds instead of 2–15 hours by hand. All 784 panels of one real project matched the manual spec line by line.

Status
MVP in operation
Timeline
6 weeks
Stack
  • Python
  • ezdxf
  • ODA File Converter
  • openpyxl
  • customtkinter
  • PyInstaller

The task

A sandwich panel manufacturer lays out each project in CAD, then counts hundreds of panels by hand and types the spec into Excel. On real projects this took 2–15 hours, and 1 to 15 days passed between a finished drawing and a spec sent to the customer. Drawings were marked up inconsistently — text tags on some, dimensions only on others — so a simple parser would not do.

What we built

Outcome

784/784 and 189/189
panels on one project and wall panels on another matched the manual specs line by line, size groups included; area within 0.001 m²
2–15 h → 10–30 s
to produce a project spec: manual work vs app processing, measured on real projects
40–200 h/month
potential engineering time saved at 20–30 projects a month, per the project's economics model
1–3 months
estimated payback, per the project's economics model

More cases

Real estate · PropTech marketplace

MVP in operation

Land-plot marketplace with a next-step plan: MVP in 2 months

From a mock-up to a working platform: plot → works → contractor → request. Rule-based next-step engine, three dashboards, personal-data compliance. MVP in 2 months.

2 months
from approved spec to pre-release MVP on an HTTPS stand — week 9 against the plan's own 10–13 week estimate
7 days
from spec to the first full-implementation commit: 168 files, 21.5k lines, then two months of hardening to pre-release

EdTech · HR-tech

MVP in operation (demo stand)

From business canvas to a student-work marketplace demo in about six weeks

The client had a business model and no product. We built a student-task marketplace MVP where the server enforces legal and platform rules, and put a demo stand live.

~6 weeks
from first commit to a deployed demo with all workspaces; 7 working days in commit history
3 checks
run by the server before a contractor is assigned: data consent, self-employed status, mentor — each with a plain refusal

Music tech · SaaS

MVP in operation (closed launch)

Music releases without missed deadlines

Release ops for independent labels: 9-stage lifecycle, pitching deadlines for 12 stores, AI drafts with human approval. Zero to production-grade in 7 weeks.

7 weeks
from first commit to a production-grade stack with Vault, encrypted backups, SLOs and a move to a Russian data centre (265 commits)
16 days
from project start to an investor presentation with a live product demo

Estimate the impact on your own figures

AVA is a process-economics calculator. In a couple of minutes it shows whether a similar task pays off in your case — before any call and with no commitment.

Estimate the impact with AVA

Have a similar task?

Describe the process and the data you have. We will tell you what can be measured in money and what cannot — before any work starts.

or email us directly: hello@xteam.pro

or email us directly: hello@xteam.pro