Real estate · PropTech marketplace

Land-plot marketplace with a next-step plan: MVP in 2 months

From a mock-up to a working platform: plot → works → contractor → request. Rule-based next-step engine, three dashboards, personal-data compliance. MVP in 2 months.

Status
MVP in operation
Timeline
4.5 months, MVP in 2
Stack
  • Python / FastAPI
  • PostgreSQL + PostGIS
  • React / TypeScript
  • Redis
  • Yandex Maps
  • Docker / Traefik

The task

The client was launching a marketplace for land plots and the services needed to develop them. A buyer who finds a plot does not know which works are mandatory (title check, surveying, geology, utilities) and hunts for contractors by hand, while contractors get leads with no context. All that existed was a visual prototype: a map with filters, no backend, roles or requests.

What we built

Outcome

2 months
from approved spec to a pre-release MVP on an HTTPS stand: week 9 against the plan’s own 10–13 week estimate
7 days
from spec to the first full-implementation commit: 168 files, 21.5k lines, then two months of hardening to pre-release
93 endpoints · 26 tables · 19 screens
MVP scope: 13 domain modules, 82 tests, 5 roles (three dashboard types plus moderator and super-admin)
11 rules
in the next-step engine: a prioritised list of works, about 20 service types across 14+ categories, a reason for every recommendation

Services

More cases

Manufacturing · Building materials

MVP in operation

Panel specs from CAD drawings in seconds, not hours

Reads DWG/DXF layouts and builds the Excel spec: 10–⁠30 seconds instead of 2–⁠15 hours by hand. All 784 panels of one real project matched the manual spec line by line.

784/784 and 189/189
panels on one project and wall panels on another matched the manual specs line by line, size groups included; area within 0.001 m²
2–15 h → 10–30 s
to produce a project spec: manual work vs app processing, measured on real projects

EdTech · HR-tech

MVP in operation (demo stand)

From business canvas to a student-work marketplace demo in about six weeks

The client had a business model and no product. We built a student-task marketplace MVP where the server enforces legal and platform rules, and put a demo stand live.

~6 weeks
from first commit to a deployed demo with all workspaces; 7 working days in commit history
3 checks
run by the server before a contractor is assigned: data consent, self-employed status, mentor; each with a plain refusal

Marketplace e-commerce · Pricing

Pilot

Rule-based repricing: a pilot whose contract terms are enforced in code

Competitor prices tracked per SKU, a price computed by rules inside an agreed corridor and applied only after confirmation. Pilot: 10 SKUs, setup within 14 days.

10 SKUs · 2 scenarios
pilot scope; the SKU cap and both scenarios are enforced in code and verified by contract tests, so the cap cannot be exceeded
up to 14 days
contractual setup window from client inputs to launch, then a 1-month pilot; the service tracks the dates and closes access when the period ends

Estimate the payback of a similar process

AVA lets you work out the economics of your process on your own figures, with no form and no price from us. It shows what the manual work costs, what cash effect automation would give and what budget would pay back. If the effect does not even cover running costs, it says so.

Estimate the payback

Discuss a similar problem

Describe the process and the data you have. Before any work starts we will tell you what can be measured in money, what cannot, and whether it is worth doing.

In the reply we will say what we understood, what we need to clarify and whether it is worth doing.

or email us directly: hello@xteam.pro

New write-ups on Telegram